Skip to content

Country

006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green - 1
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green - 2
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green - 3
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green - 4
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green - 5
006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green - 6
1 / 6

006# Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope - Green

Colour Green
R400
incl. VAT
Dispatches in 1 – 3 days
Color Green

Same price across all color options · selecting one updates the gallery

Nationwide delivery
2–4 working days to major metros
Secure checkout
Card, EFT, Ozow and PayFast
30-day returns
Unused, in original packaging
Description
  • Made of durable nylon material with a 360° rotating black heavy-duty clip and soft padding
  • Very suitable for large, medium and small dogs
  • This dog training leash and collar set is made of strong climbing rope and a durable 360-degree non-tangled rust-proof rotating hook, which is stronger than other standard dog leashes and collars
  • With heavy metal buckles, when your dog suddenly tries to run, it can firmly grasp the collar or seat belt
  • Reflective stripes with highly reflective light can help you and your dog stay safe at night
  • Size: 120cm

In the box

  • 1 x Dog Training Leash
  • Other things not included
Specifications
SKU
642200027B
Colour
Green
Package dimensions
30 × 10 × 5 cm
Gross weight
0.23 kg
Units per pack
44
Dispatch
1 - 3 days
Category
Home & Garden › Pet Supplies › Collars & Harnesses › Pet Harness & Leash
What’s in the box 2 items
  • 1 Dog Training Leash
  • Other things not included
Shipping & returns South Africa
Dispatch
Orders placed before 13:00 are picked the same day. Dispatch time for each item is shown next to the price.
Delivery
Courier to your door: 2–4 working days to Gauteng, Cape Town and Durban; 3–6 days to outlying areas.
Returns
30 days from delivery for unused goods in original packaging. Faulty items are replaced or refunded in full.
Warranty
12-month warranty against manufacturing defects, handled locally — no cross-border shipping required.
R400
1 - 3 days

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare